Chelpipe group's press centre
The ChelPipe Warehouse Complex has supplied 174 tons of large-diameter pipes (LDP) for the construction of a bridge across the Ob River. The products will be used for crossing utility lines from the construction site of the bridge across the river at Ippodromskaya Street in Novosibirsk. The pipes were produced at the Chelyabinsk Pipe Plant.
The batch consisted of EW longitudinal pipes with a diameter of 530–1,220 mm and a wall thickness of 10–12 mm made of QT steel 17G1S. The entire scope of products was delivered to the client in two months.
ChelPipe Warehouse Complex supplies tubular products for construction of fourth bridge across the Ob River in Novosibirsk
The ChelPipe Warehouse Complex has supplied 174 tons of large-diameter pipes (LDP) for the construction of a bridge across the Ob River. The products will be used for crossing utility lines from the construction site of the bridge across the river at Ippodromskaya Street in Novosibirsk. The pipes were produced at the Chelyabinsk Pipe Plant.