20%
Chelpipe Group catalog
Chelpipe Group catalog
Search

Perforated Liner

10 items

Perforated Liner is an equipment designed to provide hydrodynamic communication between the wellbore and the reservoir formation without additional perforation jobs of the production casing or liner, and to prevent near wellbore zone destruction.

Base pipe OD, in [mm]
Back
Reset
Nothing found
Min weight of the 20ft (6 m) long screen, lbs [kg]
Back
Reset
Nothing found
Sort: 
Back
Individual order Download catalog
Sort:
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 2 7/8 [73]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 163 [74]
Nominal weight, ppf [kg/m]: 8,2 [12,3]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 3 ½ [89]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 190 [86]
Nominal weight, ppf [kg/m]: 9,5 [14,3]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 4 [102]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 220 [100]
Nominal weight, ppf [kg/m]: 11 [16,7]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 4 ½ [114]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 313 [142]
Nominal weight, ppf [kg/m]: 15,7 [23,7]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 5 [127]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 375 [170]
Nominal weight, ppf [kg/m]: 18,8 [28,3]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 5 ½ [140]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 397 [180]
Nominal weight, ppf [kg/m]: 19,9 [30]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 5 ¾ [146]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 450 [204]
Nominal weight, ppf [kg/m]: 22,5 [34]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 6 5/8 [168]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 578 [262]
Nominal weight, ppf [kg/m]: 28,9 [43,7]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 7 [178]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 664 [301]
Nominal weight, ppf [kg/m]: 33,2 [50,2]

- +
items
Perforated Liner
Full length of the screen, ft [m]: 13 – 40 [4 -12]
Connection: LTC, STC, BTC, tubing
Min distance from pipe box to perforations, in [mm]: 12 [300]
Min distance from pin to perforations, in [mm]: 10 [250]
Perforations per ft [per m]: 11…110 [36…360]
Perforation diameter, in [mm]: 0.4…0.8 [10…20]
Perforated length, ft [m]: 10 – 30 [3 – 9]
Base pipe OD, in [mm]: 9 5/8 [245]
Min weight of the 20ft (6 m) long screen, lbs [kg]: 739 [335]
Nominal weight, ppf [kg/m]: 37 [55,8]

- +
items

Leave online order for equipment selection

Leave a message and our manager will contact you

Application submitted

In the near future, our manager will contact you

Send again
Сайт использует файлы «cookie»
Chelpipegroup.com uses cookies to make your site experience as positive as possible. If you continue to use our services, we will assume that you agree to the use of cookies. Learn more about cookies and how to stop using them.
Total: 15 товаров
The cart is empty

Add products from the catalog to place an order.

Go to catalog