After the Cup, the Arena has been used by the local Rotor-Volgograd football club. In addition, it hosts mass cultural and sport events, festivals, exhibitions and concerts.
For the construction of the stadium, Chelyabinsk Pipe Rolling Plant and Pipeline Connecting Bends (SOT) (part of ChelPipe Group) supplied a batch of 168 mm steel pipes with a wall thickness of 6 mm and metal arches made of 180 mm bare pipe with a wall thickness of 7 and 8 mm. It was for the first time that SOT produced bent rebars of this type and size.
For the construction of the stadium, Chelyabinsk Pipe Rolling Plant and Pipeline Connecting Bends (SOT) (part of ChelPipe Group) supplied a batch of 168 mm steel pipes with a wall thickness of 6 mm and metal arches made of 180 mm bare pipe with a wall thickness of 7 and 8 mm. It was for the first time that SOT produced bent rebars of this type and size.