OCTG for Gazpromneft-Orenburg fields
Gazpromneft-Orenburg (an upstream subsidiary of Gazprom Neft) is developing 11 licence blocks in the Orenburg Region, including 7 hydrocarbon fields.
Segment: Oil and gas pipes

73.02 mm
diameter5.51 mm
wall thicknessChT-VTm1
(modified gasometric) threaded connectionThe ChT-VTm1 premium threaded connection is an alternative to the ChT-VT threaded connection, featuring modified thread parameters and serving as a substitute for imported VAGT connections by Voestalpine (Austria) and NEW VAM by Vallourec (France).